Project management of the fish ladder construction at the dam of Gormaz (Soria) (Hydroelectric Gormaz). RPI (Renewable Power International) (2012).
Technical Assistance to follow-up the urgent repairing works of the Cebolla Dam(Toledo) (Hydropower Plant of Cebolla). RPI (Renewable Power International) (2012).
Management of the Flood Defense Project for the Cantillana Solar Photovoltaic Plant (Sevilla). Anemoi Cantillana, SLU (2011).
Expropriation, monitoring and control of the works for Water Supply Project. Burgos Vicinity. Aguas del Duero (In collaboration) (2006-2008).
Construction management, inspection and control of the works for the Water Supply Project of Santander. Aguas de la Cuenca del Norte (In collaboration) (2005-2006).
Management, control and surveillance of the works of irrigation modernization project of the Irrigators Community of Guadalcacín. Cádiz. Society of Agricultural Infrastructure. SEIASA (In collaboration)(2003-2006).
Management, control and monitoring of works of wastewater collectors in Porrino, Seixal river, Miño river and Caselas river the collector and general interceptor of the Miño river in Tui, general sanitation of the Louro river basin (Pontevedra). North Basin Authority. MIMAM (In Collaboration) (2002-2004)
Management, control and monitoring of the works of intercepting collector and WWTP of San Nicolás del Puerto in Seville. (1994-1996). |