Water Quality modelling for the Edrada Reversible Hydropower Plant Project. (In collaboration). Gas Natural Fenosa Engineering (2012).
Report on aquatic environment affection in Bernesga River of the dam for cooling facilities of La Robla Thermal Power Plant and proposal for a fish ladder (Leon). (In collaboration). Gas Natural Fenosa SDG (2012).
Operational flow rate variations compatible with aquatic environment preservation by the Requejada and Camporredondo Hydropower Plants (Palencia). RPI (Renewable Power International) (2012).
Ecological flow rates determination downstream Baserca Dam (Noguera Ribagorzana River) and Llauset Dam (Llauset River). Endesa Generación (2012).
Ecological flow rates measuring proposal at Villaverde Hydropower Plant (Toledo). RPI (Renewable Power International) (2012).
Draft for the installation of a Composting Plant in the plot 72 of the TM polygon 1 Cabanillas de la Sierra (Madrid). Community of Madrid Goverment (2009).
Study of impact of human activity on the status of surface waters, identification of pressures, impact assessment and location of potential sites of reference in the scope of the Duero River Basin. MIMAM (2004-2005).
Intensive analytical control and unfishing in supplying reservoirs because of the drought in the Segura River Basin during the summer of 1995. Segura River Basin Authority (1995-1996).
Environmental impact of channeling of the lower section of the Guadalhorce River. (Hydric Control Program and Water Handling). South of Spain Basin Authority (1995). |